Brown and Caldwell Home Page
Technical Papers RECENT PAPERS    ALL PAPERS      LOG IN

Brown and Caldwell engineers and scientists are technical and thought leaders in the environmental sector. Meet the people who have been advancing innovation for more than 70 years.
Author      Title/Abstract      


Use of Detailed Construction Cost Estimating During the Early Stages of Wastewater Facility Planning
Author: Denny S. Parker, Steven J. Krugel, Marc Pritchard
Date:
NULL

Public and private utilities selecting a wastewater treatment system face a difficult task in comparing the costs of treatment alternatives. Decisions about the type of treatment process to be employed are typically made very early in a project when the least amount of detailed information is available about a proposed design. Use of conceptual-level cost estimates has been the usual practice at the facility planning stage, and the accuracy of individual alternative cost estimates is typically given as + 50 to - 30 percent. This is an extremely low level of accuracy considering decisions must be made committing the utility to long term capital and O & M costs which can last for decades. These early project decisions are highly significant because the opportunity for saving costs declines as the project becomes committed to a process concept in predesign and design. Improvements in the methods for cost estimating at the facilities planning stage could yield better data for decisions and thus generous cost savings.